Call us : 01-5261776
Mail us : info@ies.com.np

Betan Karnali Hydroelectric Project (688 MW)

Project Image

Released Date : January 3, 2018

Client: NEA Engineering Company Ltd.; Betan Karnali Hydroelectric Project is a Peaking RoR project of installed capacity of 688 MW. The project is located in the border of Achham and Surkhet district. Its proposed headwork is located around 10 km from Lyati Bindraseni. The project has approximate catchment area of 22,555 km2 and uses design discharge of 373.10 m3/s at 50% probability of exceedence. It generates total annual energy of 4377.87 GWh.

What We Did?
  • Staff Gauge Installation (6m)
  • Discharge Measurement by Sounding Reel Method from Suspension Bridge