DISCHARGE MEASUREMENT USING CABLE WAY

Released Date : September 25, 2018

Client: Soil Test Pvt. Ltd. Project Location: Sankhuwasabha District Province no. : 1 Project Capacity: 30MW

What We Did?

Automatic Rain Gauge Installation at KAHEP

Released Date : September 18, 2018

Client: NEA Engineering Company Ltd. Project Location: Sankhuwasabha District Province No. : 1 Project Capacity: 450 MW

What We Did?

Automatic Rain Gauge Installation at JSHEP

Released Date : September 16, 2018

Client: NEA Engineering Company Ltd. Project Location: Dolpa District Province No. : 6 Project Capacity: 427 MW

What We Did?

Upper Arun Hydroelectric Project (335 MW),

Released Date : June 12, 2018

Client : Soil Test Private Limited Project Location : Sankhuwasabha District, Province No. 1 Project Capacity : 335 MW

What We Did?
  • 1. Staff Gauge Installation 4 m
    2. Discharge Measurement By Sounding Reel Method

Ikhuwa Khola Hydroelectric Project (30 MW)

Released Date : June 12, 2018

Client : Soil Test Private Limited Project Location : Sankhuwasabha District, Province No. 1 Project Capacity : 30 MW

What We Did?
  • 1. Staff Gauge Installation 3 m
    2. Discharge Measurement By Wading Rod Method

Garchyang Khola Hydropower Project

Released Date : June 12, 2018

Client : CITIZEN HYDROPOWER COMPANY PVT. LTD. Project Location : Kaski District,Province No. - 4

What We Did?
  • 1. Discharge Measurement By Wading Rod Method