Suspended Sediment Laboratory Analyses for Begnas Rupa Pump Storage Hydroelectric Project
Project: Begnas Rupa Pump Storage Hydroelectric Project
Assignment: Suspended Sediment Laboratory Analyses for Begnas Rupa Pump Storage Hydroelectric Project
Location: Kaski District, Nepal
Client: Nepal Electricity Authority
Duration: August 2019 to October 2019

Project Description: Begnas Rupa Pump Storage Hydroelectric Project is the first ever pump-storage type hydropower project in Nepal). The proposed 150 MW project will be built on Begnas and Rupa lakes in Kaski district. As Begnas Lake is located at a higher altitude than Rupa Lake, hydroelectricity can be generated by channeling water from Begnas to Rupa where the powerhouse will be built. There is a natural head of around 60 meters which will be sufficient to generate electricity. The project, according to the state-owned power utility, will be designed to generate power for 4 hours daily. As per the pre-feasibility study, water will be channeled into Rupa from Begnas during peak times to produce electricity. “During off-peak times, like mid-day or midnight, the project will be using a reversible turbine to pump the water back into Begnas from Rupa.
Scope of Services:
1. Analysis of the suspended sediment samples collected from site and delivered by the client;
2. Types of analysis:
• Concentration Analysis: 412 nos.;
• Particle Size Distribution Analysis: 24 nos; and
• Mineral Content Analysis: 24 nos.;
3. Data Compilation, report preparation and submission.
4. Equipment Used:
a) Filtration system, Drying Oven and weighing accessories;
b) Microscope for Mineral content analysis; and
c) Particle Size Analyzer for Particle Size Distribution Analysis.