Gauge installation and Field Discharge measurement of UIKHEP

Gauge installation and Field Discharge measurement of UIKHEP) Project: Upper Ikhuwa Khola Hydroelectric ProjectAssignment: Gauge installation and Field Discharge measurement of UIKHEP Location: Sankhuwasabha DistrictClient: Bond Consultants Pvt. Ltd.Duration:  February 2020…

Continue Reading Gauge installation and Field Discharge measurement of UIKHEP

Supply and Installation of Satellite Based Automatic Water Level Recorder including one-time discharge measurement for Nyadi Phidi Hydropower Project

Supply and Installation of Satellite Based Automatic Water Level Recorder including one-time discharge measurement for Nyadi Phidi Hydropower Project Project: Nyadi Phidi Hydropower ProjectAssignment:Supply and Installation of Satellite Based Automatic…

Continue Reading Supply and Installation of Satellite Based Automatic Water Level Recorder including one-time discharge measurement for Nyadi Phidi Hydropower Project

Discharge measurement and Preliminary survey of Upper Surnayagad HEP, Baitadi

Discharge measurement and Preliminary survey of Upper Surnayagad HEP, Baitadi Project: Upper Surnayagad HEP Assignment: Discharge measurement and Preliminary survey of Upper Surnayagad HEP Location: Baitadi District Client: Rays Consult…

Continue Reading Discharge measurement and Preliminary survey of Upper Surnayagad HEP, Baitadi

Hydrology and sediment Measurement of Kaligandaki Storage Hydropower project (844MW)

Hydrology and sediment Measurement of Kaligandaki Storage Hydropower project (844MW) Project: Kaligandaki Storage Hydropower projectAssignment: Hydrology and sediment Measurement of Kaligandaki Storage Hydropower project (844MW) Location: Parbat, Myagdi DistrictClient: Jade Consult…

Continue Reading Hydrology and sediment Measurement of Kaligandaki Storage Hydropower project (844MW)

Sedimentation Study for Detailed Engineering Study of Betan Karnali Hydroelectric Project.

Sedimentation Study for Detailed Engineering Study of Betan Karnali Hydroelectric Project Project: Betan Karnali Hydroelectric Project Assignment: Sedimentation Study for Detailed Engineering Study of Betan Karnali Hydroelectric Project Location: Surkhet…

Continue Reading Sedimentation Study for Detailed Engineering Study of Betan Karnali Hydroelectric Project.

Monthly Discharge Measurement for Various Hydropower Projects located in Sindhupalchowk, Myagdi, Dolakha and Manang Districts

Monthly Discharge Measurement for Various Hydropower Projects located in Sindhupalchowk, Myagdi, Dolakha and Manang Districts Project: Various Hydropower Projects locatedAssignment: Monthly Discharge Measurement for Various Hydropower Projects located in Sindhupalchowk,…

Continue Reading Monthly Discharge Measurement for Various Hydropower Projects located in Sindhupalchowk, Myagdi, Dolakha and Manang Districts

Hydrology and Sediment Study of Chameliya Hydropower Project (60 MW), Darchula District

Hydrology and Sediment Study of Chameliya Hydropower Project (60 MW), Darchula District Project: Chameliya Hydropower Project  Assignment: Hydrology and Sediment Study of Chameliya Hydropower Project (60 MW), Darchula District Location:…

Continue Reading Hydrology and Sediment Study of Chameliya Hydropower Project (60 MW), Darchula District

Hydrology and Sediment Investigation of Simbuwa Khola Hydropower Project

Hydrology and Sediment Investigation of Simbuwa Khola Hydropower Project Project: Simbuwa Khola Hydropower Project  Assignment: Hydrology and Sediment Investigation of Simbuwa Khola Hydropower Project  Location: Taplejung District, Nepal Client: Jade Consult…

Continue Reading Hydrology and Sediment Investigation of Simbuwa Khola Hydropower Project

Topographical Survey and Installation of Rain Gauge Station for Chandragiri Hill Resort

Topographical Survey and Installation of Rain Gauge Station for Chandragiri Hill Resort Project: Chandragiri Hill Resort Assignment: Topographical Survey and Installation of Rain Gauge Station for Chandragiri Hill Resort Location:…

Continue Reading Topographical Survey and Installation of Rain Gauge Station for Chandragiri Hill Resort

Supply and Installation of Satellite based Automatic Water Level Recorder in Headworks of Kunaban Khola Hydropower Project, 24.78 MW

Supply and Installation of Satellite based Automatic Water Level Recorder in Headworks of Kunaban Khola Hydropower Project, 24.78 MW Project: Kunaban Khola Hydropower Project Assignment: Supply and Installation of Satellite…

Continue Reading Supply and Installation of Satellite based Automatic Water Level Recorder in Headworks of Kunaban Khola Hydropower Project, 24.78 MW