Detailed Topographic Survey work for the river Training of Myagdi District
Project: River Training of Myagdi District
Assignment: Detailed Topographic Survey work for the river Training of Myagdi District
Location: Myagdi District, Nepal
Client: S.A.N. Engineering Solution Pvt. Ltd.
Duration: December 2019 to January 2020


Project Description: Through this project the client wishes to conduct the survey for the river training works of the river in Myagdi District. The total stretch of the river to conduct river training works is 10.90 Km.
Scope of Services:
1. Transportation of the necessary equipment and selection of the proper location to carry out the discharge measurement at headwork of Ikhuwa Khola Hydropower Project;
2. Conducting the periodic discharge measurement for a total of six measurements on weekly basis starting from 3rd week of February to last week of March; and
3. Calculation of discharge and report preparation.
4. Equipment Used:
a) Gurley Price Current Meter
b) Wading Rod Set