You are currently viewing Simbuwa Khola HPP Road alignment survey and Cadastral mapping work

Simbuwa Khola HPP Road alignment survey and Cadastral mapping work

Simbuwa Khola HPP Road alignment survey and Cadastral mapping work

Project: Simbuwa Khola Hydropower Project

Assignment: Simbuwa Khola HPP Road alignment survey and Cadastral mapping work

Location: Taplejung District, Nepal

Client: ITECO-SILT-UDAYA JV

Duration:  September 2019 to September 2019

Project Description: The project is located in Tapethok VDC of Taplejung district of Nepal, utilizing the flow of Simbuwa Khola, a tributary of Arun River. The scheme is 70.34 MW Run-of-Rive type hydropower project with a gross head of 888.6 m and design discharge of 9.24 cumec at 40% flow exceedance level. The major structures of the project are the spillway weir, undersluice and appurtenant structures, approach canal, desanding basin, a headrace tunnel of 4.392 km length, which will lead to a 24.22m high surge shaft. The design flow will be directed towards the powerhouse through 2710.42 m pressure shaft. The annual energy generation from the project will be 378.96 GWh and the electricity generated will be evacuated through the Koshi Corridor.

Scope of Services:

1. Desk study of the route provided by the client;
2. Road alignment walkover survey over project structure area part with guidance of client’s representative and recording of the center alignment by hand held GPS;
3. Recording reference point of identified plot at field and identification of different size and number of plots with the help of digital cadastral sheet provided by the client;
4. Different plot number production from digital cadastral at site in GIS and Excel;
5. Purchase of different document related to cadastral work, landowner information etc. from Napi office of Taplejung; and
6. Preparation and submission of softcopy draft and final report of the works performed.