Support Service for SRT Survey for Kimathanka Arun Hydroelectric Project
Project: Kimathanka Arun Hydroelectric Project
Assignment: Support Service for SRT Survey for Kimathanka Arun Hydroelectric Project
Location: Sankhuwasabha District, Nepal
Client: Sukasu Engineering and Geo-Environment Services (P) Ltd.
Duration: June 2018 to October 2018



Project Description: Kimathanka Arun Hydroelectric Project is a Peaking RoR project of installed capacity of 450 MW. Kimathanka Arun HEP is northern most project proposed along the Arun river located in Sankhuwasabha district. The headworks of the project is located roughly 2.7 km South of the Nepal China border. The project has approximate catchment area of 25,300 km2 and uses design discharge of 149 m3/s. It generates total annual energy of 2925 GWh.
Scope of Services:
1. Arrangement of all survey equipment, transportation facilities and human manpower required to carry out the job;
2. Provide the Survey line for conducting SRT Survey in field; and
3. Mapping and Reporting of actual SRT lines surveyed in the field;
4. Equipment Used:
• Total Station-1 Set; and
• Hand Held GPS-1 Set.