Sedimentation Study of Jagdulla River for Detailed Engineering Study of Jagdulla Storage Hydroelectric Project
Project: Jagdulla Storage Hydroelectric Project
Assignment: Sedimentation Study of Jagdulla River for Detailed Engineering Study of Jagdulla Storage Hydroelectric Project
Location: Dolpa District, Nepal
Client: ITECO Nepal (P) Ltd.
Duration: May 2018 to June 2019

Project Description: Jagdulla Hydroelectric Project is a peaking run off river type project of installed capacity 106 MW. The project is located in Dolpa district. The project has approximate catchment area of 662 km2 and uses design discharge of 16. 7 m3/s. It generates total annual energy of 635.52 GWh.
Scope of Services:
1. Carrying out suspended sediment sampling using depth integrated sediment sampler in following frequency;
• May to September: two sets daily;
• October and November: one set daily;
• December to February: one set weekly; and
• March and April: one set daily
2. Set up and operation of sediment laboratory at project site;
3. Carrying out laboratory test analysis in following frequency:
• Concentration Analysis: 1536 samples;
• Mineral Content Analysis: 50 samples; and
• PSD analysis: 50 samples using laser diffraction method
4. Submission of monthly report including lab test results; and
5. Development of Sediment Rating Curve.
6. Equipment used to take samples using depth integration method:
a) USGS Depth Integrated Sampler with four-wheel crane system;
b) Filtration System and weighing accessories;
c) Trinocular Stereo Zoom Microscope;
d) Laser Diffraction Particle Size Analyzer.