Topographical Survey and Mapping of Jumla Bazaar- Uthu Syaulagadigaun- Chotra Road (33 KM)

Topographical Survey and Mapping of Jumla Bazaar- Uthu Syaulagadigaun- Chotra Road (33 KM)

Topographical Survey and Mapping of Jumla Bazaar- Uthu Syaulagadigaun- Chotra Road (33 KM)

Project: Jumla Bazaar- Uthu Syaulagadigaun- Chotra Road

Assignment: Topographical Survey and Mapping of Jumla Bazaar- Uthu Syaulagadigaun- Chotra Road (33 KM)

Location: Jumla District, Nepal

Client: Paragon-GNDA-Planet Test JV

Duration:  September 2019 to November 2019

Project Description: The project location is in Jumla district, province no. 6 of Nepal. Topographical survey and mapping of the road starting from Jumla Bazaar to Urthu Syaulagadigaun to Chotra Road for total of 33 km is done.

Scope of Services:

1. Transfer of National trig point and Benchmark to project area
2. Road alignment fixing by setting out intersection point (IP) and intermediates points;
3. Establishment of Bench Marks (BM) at spacing not greater than 500m interval along the33 Km road alignment with RCC pillar post of size 15cm*15cm*50 cm with top marking and 5cm above the natural ground or on boulder if available;
4. Establishment of all the reference point and control point on the permanent structure and cross section at LS 15*25 m interval depending upon the terrain and 2.5m interval across the alignment, minimum 25m both sides from the center-line;
5. Topographical Survey of road in minimum 25m wide strip on either side of the center line;
6. Compilation, preparation and submission of survey data, D-cards, survey files and kml files;
7. Equipment Used:
   a) DGPS (3 sets); and
   b) Total Station (3 sets).