Preparation of Due Diligence Assessment Report of Likhu 2 Hydroelectric Project

Preparation of Due Diligence Assessment Report of Likhu 2 Hydroelectric Project Project: Likhu 2 Hydroelectric ProjectAssignment: Preparation of Due Diligence Assessment Report of Likhu 2 Hydroelectric ProjectLocation: Ramechhap and Solukhumbu…

Continue Reading Preparation of Due Diligence Assessment Report of Likhu 2 Hydroelectric Project
Preparation of Detail Project Report for Lamiraha Multipurpose Dam, Sainanmaina, Rupandehi
bty

Preparation of Detail Project Report for Lamiraha Multipurpose Dam, Sainanmaina, Rupandehi

Preparation of Detail Project Report for Lamiraha Multipurpose Dam, Sainanmaina, Rupandehi Project: Lamiraha Multipurpose Dam ProjectAssignment: Preparation of Detail Project Report for Lamiraha Multipurpose Dam, Sainanmaina, RupandehiLocation: Rupandehi DistrictClient: ITECO-SITARA-EGPL…

Continue Reading Preparation of Detail Project Report for Lamiraha Multipurpose Dam, Sainanmaina, Rupandehi
Study of Maintenance Requirements and System Upgrading of Narayani Lift Irrigation System (Pumping Station-A)
bdr

Study of Maintenance Requirements and System Upgrading of Narayani Lift Irrigation System (Pumping Station-A)

Study of Maintenance Requirements and System Upgrading of Narayani Lift Irrigation System (Pumping Station-A) Project: Narayani Lift, Khageri Irrigation ProjectAssignment: Study of Maintenance Requirements and System Upgrading of Narayani Lift…

Continue Reading Study of Maintenance Requirements and System Upgrading of Narayani Lift Irrigation System (Pumping Station-A)

Preparation of EPC bidding document and technical specification of Nyadi Phidi Hydropower Project

Preparation of EPC bidding document and technical specification of Nyadi Phidi Hydropower Project Project: Nyadi Phidi Hydropower ProjectAssignment: Preparation of EPC bidding document and technical specification of Nyadi Phidi Hydropower…

Continue Reading Preparation of EPC bidding document and technical specification of Nyadi Phidi Hydropower Project

Design of River Protection Works at Pokhara International Cricket Stadium

Design of River Protection Works at Pokhara International Cricket Stadium Project: International Cricket Stadium River Training ProjectAssignment: Design of River Protection Works at Pokhara International Cricket StadiumLocation: Kaski DistrictClient: Ministry…

Continue Reading Design of River Protection Works at Pokhara International Cricket Stadium

Construction progress monitoring and bill verification of “Seti Nadi Hydroelectric Project” (25,000 kW)

Construction progress monitoring and bill verification of "Seti Nadi Hydroelectric Project" (25,000 kW) Project: Seti Nadi Hydroelectric Project Assignment:Construction progress monitoring and bill verification of "Seti Nadi Hydroelectric Project" (25,000…

Continue Reading Construction progress monitoring and bill verification of “Seti Nadi Hydroelectric Project” (25,000 kW)

Due Diligence Study of Shyam Khola Hydropower Project

Due Diligence Study of Shyam Khola Hydropower Project Project: Shyam Khola Hydropower ProjectAssignment:Due Diligence Study of Shyam Khola Hydropower ProjectLocation: Bhojpur DistrictClient: Rautaha Construction Pvt. Ltd.Duration:  October 2020 to December…

Continue Reading Due Diligence Study of Shyam Khola Hydropower Project

Design Review of Proposed Earthen Dam, Spillway, and Bridge and Prepare materials specification of RLCIDP

Design Review of Proposed Earthen Dam, Spillway, and Bridge and Prepare materials specification of RLCIDP Project: Rupa Tal Conservation Integrated Development Project Assignment:Design Review of Proposed Earthen Dam, Spillway, and…

Continue Reading Design Review of Proposed Earthen Dam, Spillway, and Bridge and Prepare materials specification of RLCIDP

Field Investigation, Detailed Engineering Design and Construction Supervision of Madhya Tarakhola Small Hydropower Project (2.2 MW)

Field Investigation, Detailed Engineering Design and Construction Supervision of Madhya Tarakhola Small Hydropower Project(2.2 MW) Project:  Madhya Tarakhola Hydropower Project  Assignment: Field Investigation, Detailed Engineering Design and Construction Supervision of…

Continue Reading Field Investigation, Detailed Engineering Design and Construction Supervision of Madhya Tarakhola Small Hydropower Project (2.2 MW)

Study of Diversion Possibility from Constructed Tunnel and Survey and Design of Access Road, Hydraulic Design of Diversion Canal and Bathymetric Survey of Bheri River at Dam Site.

Study of Diversion Possibility from Constructed Tunnel and Survey and Design of Access Road, Hydraulic Design of Diversion Canal and Bathymetric Survey of Bheri River at Dam Site Project: Bheri…

Continue Reading Study of Diversion Possibility from Constructed Tunnel and Survey and Design of Access Road, Hydraulic Design of Diversion Canal and Bathymetric Survey of Bheri River at Dam Site.