Supply and Installation of Satellite based Automatic Water Level Recorder in Headworks of Kunaban Khola Hydropower Project, 24.78 MW

Supply and Installation of Satellite based Automatic Water Level Recorder in Headworks of Kunaban Khola Hydropower Project, 24.78 MW

Supply and Installation of Satellite based Automatic Water Level Recorder in Headworks of Kunaban Khola Hydropower Project, 24.78 MW

Project: Kunaban Khola Hydropower Project

Assignment: Supply and Installation of Satellite based Automatic Water Level Recorder in Headworks of Kunaban Khola Hydropower Project, 24.78 MW

Location: Myagdi District, Nepal

Client: Hydro Village Pvt. Ltd.

Duration:  December 2019 to January 2020

Project Description: The Kunaban Khola Hydropower Project is a Run-of-River scheme that utilizes the the flow in Kunaban Khola. The intake of Kunaban Khola Hydropower Project Scheme is located at Kunaban Kharka of Mudi V.D.C. Similarly, the power house also lies about 2 km u/s of Kunaban-Myagdi confluence.

Scope of Services:

1. Conduct Hydrological study of the river and catchment area and recommend required hydrological investigations;
2. Supply, delivery and installation of satellite based automatic water level recorder in Headworks site of Kunaban Khola Hydropower Project for water level recording;
3. Equipment configuration and integration to satellite communication system and provide training to Client for data viewing and retrieving from the server;
4. Relate automatic water level recording with the flood level to design flood warning system
5. Equipment Used:
   • Radar Level Sensor-RS485 (5-35 m range)
   • Lighting surge protector for RS-485 and 12 V DC
   • Data Logger
   • M2M Communications Terminal (Satellite type)
   • Power System (Solar Panel 55W & VRLA Battery 12v 75 Ah)
   • Metal Mast and accessories for installation and set-up