Field Investigation, Detailed Engineering Design and Construction Supervision of Madhya Tarakhola Small Hydropower Project (2.2 MW)

Field Investigation, Detailed Engineering Design and Construction Supervision of Madhya Tarakhola Small Hydropower Project(2.2 MW) Project:  Madhya Tarakhola Hydropower Project  Assignment: Field Investigation, Detailed Engineering Design and Construction Supervision of…

Continue Reading Field Investigation, Detailed Engineering Design and Construction Supervision of Madhya Tarakhola Small Hydropower Project (2.2 MW)

Study of Diversion Possibility from Constructed Tunnel and Survey and Design of Access Road, Hydraulic Design of Diversion Canal and Bathymetric Survey of Bheri River at Dam Site.

Study of Diversion Possibility from Constructed Tunnel and Survey and Design of Access Road, Hydraulic Design of Diversion Canal and Bathymetric Survey of Bheri River at Dam Site Project: Bheri…

Continue Reading Study of Diversion Possibility from Constructed Tunnel and Survey and Design of Access Road, Hydraulic Design of Diversion Canal and Bathymetric Survey of Bheri River at Dam Site.

Geotechnical and Geophysical Investigations (Core Drilling and SRT) of Nupche Likhu Hydropower Project (57.5 MW)

Geotechnical and Geophysical Investigations (Core Drilling and SRT) of Nupche Likhu Hydropower Project (57.5 MW) Project: Nupche Likhu Hydropower Project (57.5 MW)Assignment: Geotechnical and Geophysical Investigations (Core Drilling and SRT)…

Continue Reading Geotechnical and Geophysical Investigations (Core Drilling and SRT) of Nupche Likhu Hydropower Project (57.5 MW)

Topographic Survey of Simbuwa Khola Hydropower Project and Transmission Line

Topographic Survey of Simbuwa Khola Hydropower Project Project: Simbuwa Khola Hydropower Project  Assignment: Topographic Survey of Simbuwa Khola Hydropower Project  Location: Taplejung District, Nepal Client: Jade Consult Pvt. Ltd. Duration:  December…

Continue Reading Topographic Survey of Simbuwa Khola Hydropower Project and Transmission Line

Supply and Installation of Satellite based Automatic Water Level Recorder in Headworks of Kunaban Khola Hydropower Project, 24.78 MW

Supply and Installation of Satellite based Automatic Water Level Recorder in Headworks of Kunaban Khola Hydropower Project, 24.78 MW Project: Kunaban Khola Hydropower Project Assignment: Supply and Installation of Satellite…

Continue Reading Supply and Installation of Satellite based Automatic Water Level Recorder in Headworks of Kunaban Khola Hydropower Project, 24.78 MW

Design and Construction of Pumped Water Supply System

Design and Construction of Pumped Water Supply System Project: Pumped Water Supply SystemAssignment: Design and Construction of Pumped Water Supply SystemLocation: Kavrepalanchowk District, NepalClient: Fulbari ResortDuration:  October 2019 to January 2020…

Continue Reading Design and Construction of Pumped Water Supply System

Cross-section and Longitudinal Survey (Bathymetric Survey) of Narayani River for Pre-feasibility Study of Water Inland Navigation Project

Cross-section and Longitudinal Survey (Bathymetric Survey) of Narayani River for Pre-feasibility Study of Water Inland Navigation Project Project: Water Inland Navigation Project Assignment: Cross-section and Longitudinal Survey (Bathymetric Survey) of…

Continue Reading Cross-section and Longitudinal Survey (Bathymetric Survey) of Narayani River for Pre-feasibility Study of Water Inland Navigation Project

Feasibility Study and Detailed Design of Access Road and Bridges for Transportation of Raw Materials of Shaurya Cement

Feasibility Study and Detailed Design of Access Road and Bridges for Transportation of Raw Materials of Shaurya Cement Project: Transportation of Raw Materials of Shaurya Cement Assignment: Feasibility Study and…

Continue Reading Feasibility Study and Detailed Design of Access Road and Bridges for Transportation of Raw Materials of Shaurya Cement

Topographical Survey, Bathymetric Survey and Mapping of Headworks Sunsari Morang Irrigation Project

Topographical Survey, Bathymetric Survey and Mapping of Headworks Sunsari Morang Irrigation Project Project: Sunsari Morang Irrigation Project  Assignment: Topographical Survey, Bathymetric Survey and Mapping of Headworks Sunsari Morang Irrigation Project…

Continue Reading Topographical Survey, Bathymetric Survey and Mapping of Headworks Sunsari Morang Irrigation Project