You are currently viewing Support Service for SRT Survey for Jagdulla Storage Hydroelectric Project

Support Service for SRT Survey for Jagdulla Storage Hydroelectric Project

Support Service for SRT Survey for Jagdulla Storage Hydroelectric Project

Project: Jagdulla Storage Hydroelectric Project

Assignment: Support Service for SRT Survey for Jagdulla Storage Hydroelectric Project

Location: Dolpa District, Nepal

Client: Sukasu Engineering and Geo-Environment Services (P) Ltd.

Duration:  June 2018 to October 2018

Project Description: Jagdulla Storage Hydroelectric Project is a Storage type project of installed capacity 307 MW. The project is located in Dolpa district. The project has approximate catchment area of 662 km2 and uses design discharge of 39.50 m3/s. It generates total annual energy of 1098.53 GWh.

Scope of Services:

1. Arrangement of all survey equipment, transportation facilities and human manpower required to carry out the job;
2. Provide the Survey line for conducting SRT Survey in field; and
3. Mapping and Reporting of actual SRT lines surveyed in the field;
4. Equipment Used:
    • Total Station-1 Set; and
    • Hand Held GPS-1 Set.