Feasibility Study and Detailed Design of Access Road and Bridges for Transportation of Raw Materials of Maruti Cement

Feasibility Study and Detailed Design of Access Road and Bridges for Transportation of Raw Materials of Maruti Cement

Feasibility Study and Detailed Design of Access Road and Bridges for Transportation of Raw Materials of Maruti Cement

Project: Transportation of Raw Materials of Maruti Cement

Assignment:Feasibility Study and Detailed Design of Access Road and Bridges for Transportation of Raw Materials of Maruti Cement

Location: Udayapur and Siraha District, Nepal

Client: Maruti Cement Ltd.

Duration:  February 2019 to June 2019

Project Description: This project plans to study new road alignment avoiding the settlement area for the purpose of transportation of raw materials for the cement factory. It includes intermediate lane road alignment of 56 km(Maruti Cement factory _Policepatta_Khasibas_Hadaya_Mining area) and belly bridge.

Scope of Services:

A. Desk Study and Finalization of Road Alignment and Bridge Axis
   • Collection of studies done by the client and related maps;
   • Selection of three alternative routes form desk study and;
   • site visit for identification the suitable road alignment and bridge axis.
B. Topographical Survey and Mapping
   • Transfer of National trig and National benchmark to project area;
   • Setting up benchmark and two control point over every 500 m for topographical survey using DGPS over 45 KM, (Maruti                          Cement factory- -Police Patta-Khasibas_Hadaya-Maruti Cement Mining area)
   • Centre line marking and detailed survey at 25m on either side of road alignment along with establishment of temporary                 benchmark along the 45 KM route; and
   • Inventory survey work and traffic count work.
C. Hydrological Assessment
   • Collection of hydrological historical data of the catchment area;
   • Finalization of design flood and highest flood level for river bank road; and
   • Determination of the requirement of the drainage along the road and the capacity requirement of cross-drainage structures                  including culverts and cause-ways
D. Geological Mapping and Study
   • Geological mapping of 45 Km road area;
   • Study of joints of discontinuities along the road alignment.
E. Social and Environmental Study
   • Review of social and environmental parameter of the study area;
   • Site Visit and Social and Environmental baseline data collection of the alternative routes; and
   • Analysis of the alternatives and prioritize the alternatives based on social and environmental impact.
F. Detail Design of 45 Km Double Lane Road.
   • Design of double lane road pavement, cross-drainage structures, side drainage, horizontal and vertical curves, slopes, super-               elevation, suitable retaining structures, bio-engineering;
   • Detail Design of River Training Structures;
   • Design of slope stability structures such as retaining walls, crib walls, rock bolts etc along the road alignment.